Choosing a dumpster comes down to two things: volume and weight. Too small and you’ll need a second haul; too big and you’re paying for air.
A quick rule of thumb
- 10 yard: garage cleanouts, small bathroom remodels, yard waste.
- 20 yard: kitchen remodels, flooring, most roofs.
- 30–40 yard: additions, whole-home cleanouts, construction.
Watch the weight
Heavy materials like shingles, concrete and soil hit the weight limit long before the bin is full. If your project is heavy, go one size up or ask about a clean-fill bin.
10 Yard
≈ 4 pickup truck loads
Small cleanouts, yard waste, single-room projects.
7 days1 t included
from $299.00
15 Yard
≈ 6 pickup truck loads
Garage cleanouts, small remodels, moving day.
7 days2 t included
from $349.00
20 Yard
≈ 8 pickup truck loads
Kitchen remodels, roofing, flooring tear-outs.
7 days3 t included
from $399.00
30 Yard
≈ 12 pickup truck loads
Additions, large renovations, estate cleanouts.
7 days4 t included
from $479.00
40 Yard
≈ 16 pickup truck loads
New construction, demolition, commercial jobs.
7 days5 t included
from $549.00

Leave a Reply